Stage One included an upgrade of the existing Library including light, power, data and communications. This included a fibre optic link to the school administration. Stage Two was provision of electrical, data and communications to a new school block. This included lighting controls for the stage lighting. Stage Three was the upgrade of the school auditorium. This included lighting, power and dimming racks. The last stage included electrical fitout to the school tuckshop and kitchen.
Approximate value of the Project was $160k.
Australian Sports Lighting Solutions (http://www.sports-lighting.com.au/home.htm) has just compl......Read More
Tariff 33 is an Off-Peak or Economy Tariff that is 40% cheaper than the normal Tariff 11. The on......Read More
Fallon Services has put together some great deals on Daikin Air Conditioners (/daikin/daikin_air......Read More
